Surface · 0 m · 14°N 80°E

R Hari MadhavSubsea Cable Delivery

Submarine cables, from pre-survey to shore landing. Protected, to keep you connected.

📍 India · open to global relocation ⚓ 5 years · 7 systems · subsea telecommunications
Scroll to lay the cable
Profile –50 m

Submarine cable professional with five years across the full project lifecycle: desktop study and route engineering, geophysical and geotechnical survey, installation and burial, shore end landing, and permitting. Google's appointed subsea cable representative on seven systems, and now Marine Liaison Manager at SubCom, protecting cables across the company's global portfolio through AIS vessel monitoring and warning, cable awareness and authority engagement, customer route and landing advice, and live installation programmes. On site owner's authority for technical compliance, delivery and HSE on high value offshore campaigns.

7
Cable Systems
~14,000 km
Cable Handled
~3,000 km
Install & Survey (CR)
4
Concurrent Programmes
50+
Crossing Agreements
Zero
Incidents · On-time
Capability & Knowledge –1,000 m

What I actually do on the water

Six domains across the cable lifecycle. Open each for the tools and the detail behind it.

01

Marine Installation & Lay

›

Real-time control of the lay against the design: residual bottom tension, catenary and touch-down, slack and pay-out against seabed slope, and cable-engine (LCE) speed. Calling BU/XBU windows, repeater and equaliser positions, and depth of burial, keeping every metre of cable handling inside limits so nothing damages the cable, joints or wet plant.

MakaiLayResidual tensionCatenary / touch-downBU / XBURepeaters & equalisersMBR & coilingDepth of burial
02

Survey & Route Engineering

›

Geophysical and geotechnical survey supervision for route corridor, boulder, debris and geohazard assessment to IHO S-44, and turning that data into a route. Real-time acquisition and QC, then route selection, geohazard screening and burial-depth (CBRA) input.

MBESSide-scan sonarSub-bottom profilerMagnetometerROV / AUVCPT / coring / grabQINSy · EIVAArcGIS · AutoCAD RPL/SLDIHO S-44
03

Shore-End & Landing

›

From landing-site selection to the marine-to-onshore handover: options studies, BMH and CLS assessment, and the HDD-versus-open-cut call. Pre-lay shore-end float and pull-in, bellmouth and BMH termination, beach joint, anchoring and shore-approach burial — then CLS interface, jointing, fibre-test handover and as-laid crossing confirmation.

Landing-site selectionBMH / CLSHDD vs open-cutShore-end float & pull-inBeach jointShore-approach burialHandover
04

Cable Protection & AIS

›

Protecting live and under-construction cables: monitoring vessel traffic on AIS, spotting anchoring and fishing risk closing on the route, calling up and warning vessels standing into danger, and raising and chasing down cable-endangerment incidents. Plus the cable-awareness work that prevents faults in the first place.

AIS monitoringVessel warningAnchor / fishing threatIncident responseCable awarenessRoute corridor watch
05

Permitting & Liaison

›

Owning the permitting critical path across jurisdictions, and pushing the long-lead permits first so they don't hold up the RFS date. Cable-crossing agreements and ICPC-aligned crossing engineering, and the fisheries, community and government authority engagement that keeps a programme moving.

CRZ · DGLL · MoEFCCMaritime approvalsCrossing agreements (50+)ICPC crossing engineeringFisheries liaisonAuthority engagement
06

Delivery & Owner Representation

›

On-site owner's engineer authority: holding the standard at FAT, controlling scope and schedule, managing vendors and contractors, and owning HSE and the MOP/ITP paperwork end to end. Where a unit comes up marginal, holding sign-off until the cause is found and retested.

Owner's engineerFAT acceptancePFE/PFU · OTDRScope & scheduleVendor managementNEBOSH HSEPMI-PMP
Track Record –3,000 m

Experience

Click any role to open the detail.

Marine Liaison Manager· SubCom2025 — Present
Global cable portfolio · marine liaison, cable protection & permitting
  • Monitor vessel traffic over in service and under construction cables on AIS around the clock, read developing tracks against the cable corridor, pick up anchoring and trawling risk early, and call up and warn vessels standing into danger; log and follow every cable endangerment incident through to closeout.
  • Run the cable awareness programme: brief maritime and coastal authorities, navies, port and fisheries bodies and fishing communities on cable routes, protection zones and safe working practice, and chair cable awareness meetings with coastal and sea link project teams.
  • Advise customers directly on route and landing planning, burial strategy and marine risk, so the engineering and permitting calls get made early rather than late.
  • Own the permitting critical path across jurisdictions, from coastal zone clearances and landing licences to environmental consents and maritime approvals (CRZ, DGLL, MoEFCC, Gulf authorities), and sequence the long lead gating permits first to protect the RFS date.
  • Manage cable crossing agreements and ICPC aligned crossing engineering (50+ notifications), direct the shore end landing side (BMH and CLS interface, HDD, depth of lowering and burial protection), and keep HSE and the MOP and ITP document control in order.
Landing-Site Survey Manager · SCNX-3· WFN2026
Bay of Bengal, east-coast India · contract
  • Put together the landing-site options study for two landings — scored each candidate on marine approach, buriability, permitting, backhaul and resilience, and gave the client a ranked recommendation.
  • Worked up BMH and CLS siting, duct and bellmouth corridors and the nearshore / surf-zone conditions, and chose HDD or open-cut for each site.
  • Ran the topographic and beach-profile survey (DGPS/GPS to natural ground level), set out the BMH, duct and trench lines, and wrote up the drawings and options report.
Google-Appointed Subsea Cable Representative· via WFN Strategies2022 — 2025
Seven cable systems · cable routes around the globe
Installation, lay & wet plant
  • Saw the Blue system through end to end, from the Calais landing in France to the branching unit off Genova in Italy, with zero incidents and on time; held owner's representative authority over roughly 3,000 km of installation and survey on a ~7,000 km system.
  • Controlled the lay in real time on MakaiLay to about 98% of design tolerance, watching residual bottom tension, catenary and touch down, slack and pay out against seabed slope and cable engine (LCE) speed, and calling the BU and XBU windows, repeater and equaliser positions and depth of burial.
  • Oversaw roughly 14,000 km of cable handling across tank loading and turns, freighter to ship and ship to ship transfers, holding bend radius, tension, coiling and speed inside limits so nothing damaged the cable, joints or wet plant.
  • Witnessed BU and repeater FAT and out of tank tests (PFE and PFU checks, OTDR, splice and return loss, optical power budget); where a unit came up marginal I held sign off and made the manufacturer find the cause and retest before I accepted it.
Shore end, survey & interface
  • Ran shore end and landing work across several systems, from pre lay shore end float and pull in, bellmouth and BMH termination, beach joint and anchoring to shore approach burial, then the handover to the onshore team: CLS interface, jointing, fibre testing and as laid crossing checks.
  • Led geophysical and geotechnical survey campaigns (MBES, side scan sonar, sub bottom profiler, magnetometer, and geotechnics such as CPT, coring and grab) to IHO S-44, ran real time acquisition and QC on QINSy and EIVA, and used ArcGIS with AutoCAD RPL and straight line diagrams for route selection, geohazard screening and burial depth (CBRA) input.
  • Acted as the single point of contact between Google, the installation contractors, vessel management and regulators across all seven systems, owning scope deviations, marine working group reviews and the daily reporting.
Offshore Coordinator· Kakinada Port2021 — 2022
Bay of Bengal
  • Handled vessel arrival coordination, Port Entry Permissions and ISPS-compliant acceptance under DG Shipping rules; berthing with the Harbour Master, and VHF / radar / AIS monitoring and tidal-window planning for deep-draught vessels.
Waters Worked –6,000 m

Areas of Operation

Installation and survey experience from the Channel to the South China Sea.

English ChannelMediterraneanLigurian SeaArabian SeaGulf of OmanArabian GulfBay of BengalSouth China SeaPhilippine SeaLuzon Strait
English Channel → Ligurian Sea

Blue

Google CR. End-to-end installation across a ~7,000 km footprint. MakaiLay to 98% design tolerance. Zero incidents, on time.

Arabian Sea / Gulf of Oman

Raman

Google CR. Shore-end landing, onshore topographic survey, HDD entry/exit verification and authority coordination.

South China / Philippine Sea

TPU & Survey Campaigns

Google CR. Geophysical and geotechnical survey supervision; MBES, SSS, SBP, AUV, ROV, coring; ArcGIS route & geohazard; QINSy/EIVA QC.

Arabian Gulf

SMW6 — Gulf Extension

SubCom. Marine and fisheries liaison, cable risk assessment, and marine and installation coordination.

Bay of Bengal / Arabian Sea

IAX & IEX

SubCom. Marine and fisheries liaison, cable risk assessment, and project and installation coordination.

Bay of Bengal

SCNX-3

WFN. Landing-site options study; BMH and CLS assessment; DGPS topographic survey; ranked recommendations to client sanction.

Qualifications –8,000 m · max depth rating

Project & Safety

PMI-PMPNEBOSH HSE Process Safety (UK)Offshore Wind Energy ProfessionalSTCW-2010BOSIET w/ HUET (OPITO)HLOH2SGMDSS GOCOffshore Medical

Subsea & Survey

OMPA UK — Offshore Survey & Cable LayingOMPA UK — Subsea Power CableFOA CFOTFOA CFOS/D

Tools

MakaiLayQINSyEIVA NaviSuiteArcGIS ProAutoCADOTDR

Education & Training

MBA, International Shipping & Logistics Management
B.Sc. Electronics
Loyola College, Vijayawada
Subsea Cable Installations
Professional training
PMI-PMP
Project Management Professional

Membership

SubOptic 2025 — Member & Mentee

Sectors

Subsea telecommunicationsOffshore wind
Seabed · Make Contact

Let's build something across the deep.

Open to roles and projects worldwide across marine operations, survey, shore end delivery, owner representation and project management. Available to relocate.

Email
harimadhav253@gmail.com
Phone
+91 6303672706